• 0

Project Consultancy, Reports & Profiles

Agro and Food Processing: Project Opportunities in Uttarakhand

PROFILE:

Food processing involves any type of value addition to agricultural or horticultural produce and also includes processes such as grading, sorting and packaging which enhance shelf life of food products. The food processing industry provides vital linkages and synergies between industry and agriculture. The Food Processing Industry sector in India is one of the largest in terms of production, consumption, export and growth prospects. The government has accorded it a high priority, with a number of fiscal reliefs and incentives, to encourage commercialization and value addition to agricultural produce, for minimizing pre/post harvest wastage, generating employment and export growth. India's food processing sector covers a wide range of products fruit and vegetables; meat and poultry; milk and milk products, alcoholic beverages, fisheries, plantation, grain processing and other consumer product groups like confectionery, chocolates and cocoa products, Soya-based products, mineral water, high protein foods etc.

RESOURCES:

Uttarakhand comprises of total are 5672568 Hectares, of which forest area is 3485847 hectares. Fruits such as apples, oranges, pear, grapes peach, plum apricot, litchi, mangoes and guava are widely grown in the state and therefore have immense potential for development of horticultural crops and processing units. The State Government will assist in establishing small & medium size Agro Parks, Food Parks etc., which will provide common infrastructure facilities for storage, processing, grading and marketing, thus ensuring that surplus fruits and vegetables do not go waste as at present. Four Agri Export Zones have already been declared under the AEZ scheme of the Government of India for Litchi, Horticulture, Herbs, Medicinal Plants and Basmati Rice. Further, efforts will continue to promote production for export and provide access to domestic and export markets for products from the State.

GOVERNMENT POLICIES:

The Ministry of Food Processing Industries (MOFPI) is a ministry of the Government of India is responsible for formulation and administration of the rules and regulations and laws relating to food processing in India. The ministry was set up in the year 1988, with a view to develop a strong and vibrant food processing industry, to create increased employment in rural sector and enable farmers to reap the benefits of modern technology and to create a of surplus for exports and stimulating demand for processed food.

•        Custom duty rates have been substantially reduced on food processing plant and equipments, as well as on raw materials and intermediates, especially for export production.

•        Wide-ranging fiscal policy changes have been introduced progressively in food processing sector. Excise and Import duty rates have been reduced substantially. Many processed food items are totally exempt from excise duty.

•        Corporate taxes have been reduced and there is a shift towards market related interest rates. There are tax incentives for new manufacturing units for certain years, except for industries like beer, wine, aerated water using flavouring concentrates, confectionery, chocolates etc.

•        Indian currency, rupee, is now fully convertible on current account and convertibility on capital account with unified exchange rate mechanism is foreseen in coming years.

•        Repatriation of profits is freely permitted in many industries except for some, where there is an additional requirement of balancing the dividend payments through export earnings.

 

Biotechnology: Project Opportunities in Uttarakhand

PROFILE

The Biotechnology sector in India is one of the fastest growing sectors of the Indian Economy. As the sector is mainly based on knowledge, it is expected that it will play an important part in shaping the Indian Economy, which is developing at a rapid pace. The Indian Biotechnology sector holds immense potential in terms of research and development, skill and cost effectiveness. As per the eight annual survey by the Association of Biotechnology-led enterprise (ABLE) and a monthly journal, Bio-Spectrum, the sector grew threefold in five years and reported a revenue of US$ 3 billion during 2009-2011 with a 17 per cent rise as compared to the previous year.

RESOURCES

Uttarakhand is an ideal destination to invest in biotechnology-based industries because of several inherent advantages and being host to vast diversity of flora and fauna and rare species of plants and animals. A high-level biotechnology board is being setup to pursue initiatives in the field of research. The state will accord the units coming under this sector with the industry status and aims to establish an internationally competitive business infrastructure and environment for the industry in the state. Further, a biotechnology park is to be developed that will integrate resources and provide a focused institutional set up for accelerated commercial growth of bio-technology and bio-informatics. The Government is also in the process of creating an Exchange for Medicinal and Aromatic Plants to serve as a common platform for research institutions, technology developers and producers.

GOVERNMENT POLICIES:

The Uttarakhand Board of Biotechnology (UBB) will help the R&D Institutions of the State to seek funds from the national and international funding agencies / donors to upgrade the infrastructure facilities. Depending upon the need, UBB and the State Government will also try to fund R&D facilities through its own resources. The State Government undertakes to provide the following facilities/terms to the companies desirous of establishing BT units in the State:

•        BT Units including related R&D Units will enjoy the status of industry and will be eligible for incentives and concessions as provided for the relevant category/class of industry in the Industrial Policy of the State. For this purpose they shall be treated as Priority Sector Industry. Department of Biotechnology will provide The State Government undertakes to provide the following facilities/terms to the companies “single-window clearance” and shall issue only one application form to set up BT Units in the State.

•        The Government proposes to establish in association with private sector a BT Park initially at Halide, Pantnagar where land/plots would be made available to prospective entrepreneurs on favourable terms. The latter, however, are also free to choose their own sites or locate the same in the other established Industrial Areas in the State.

Hydropower: Project Opportunities in Uttarakhand

PROFILES:

Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. India was the 7th largest producer of hydroelectric power in 2008 after Norway: 114 TWh and 3.5 % the world total in 2008. The potential for hydroelectric power in India is one of the greatest in the world. Small hydropower offers a wide range of benefits-especially for rural areas and developing countries. The resource is environmentally responsible and has substantial economic advantages. Efforts also being made to improve the exchange of ideas and technology related to small hydropower. In India, small hydropower up to capacity of 25 MW also includes the mini-and-micro hydropower projects which are usually confined strictly to local use. A potential of over 15,000 MW has been identified from small hydropower and Government of India has been according top priority to SHP development as thrust area.

RESOURCES:

Uttarakhand has a large network of rivers and canals which provides an immense scope for hydro-power energy. In India, the development of Micro, Mini, and Small Hydro Power Projects started in the year 1897. One of the first hydro-power stations in India was commissioned at Galogi in 1907. More power stations were subsequently developed over a period of time. In Uttarakhand, the estimated capacity of Small hydro power projects is about 1500 MW out of total estimated capacity of 20,363 MW Uttaranchal has a hydropower potential of the order of 20236 MW against which only about 1407 MW has been harnessed so far.

GOVERNMENT POLICIES:

The Government of Uttaranchal (GoU) has decided to encourage generation of power through small hydropower sources of energy, and has framed a policy so that the development of this sector serves as an engine to achieve the objective of promoting the all-round development of the region. To encourage generation of hydropower the government of Uttarakhand has formulated and implemented policies with following objectives:

•        Creation of conducive conditions for encouraging private sector participation

•        Harnessing water resources in an environment friendly manner

•        Meeting the energy demand of the state/country

•        Promotion of the overall development of the region

•        Generation of revenue from hydro resources

 

Mineral: Project Opportunities in Uttarakhand

PROFILES:

A mineral is a naturally occurring solid chemical substance formed through biogeochemical processes, having characteristic chemical composition, highly ordered atomic structure, and specific physical properties. India is endowed with significant mineral resources. India produces 89 minerals out of which 4 are fuel minerals, 11 metallic, 52 non-metallic and 22 minor minerals.

RESOURCES:

Mineral resources of Uttarakhand play a significant role in the economy of Uttarakhand. The Chamoli district of Uttarakhand is especially famous for housing a number of mineral resources in Uttarakhand. The northern division of the district consist entirely of medium to high grade metamorphic rocks, which also contains bands of volcanic rocks in some areas; the southern division contains sedimentary and low-grade metamorphic rocks, with bands of volcanic rocks in some regions. Although much is not known about the geology of the first division of Chamoli, yet the mineral resources contain rocks such as quartzite, marble, and various types of schist and gneiss. The southern division contains rocks such as gneiss, limestone, phyllites, quartzite, sericite-biotite schist and slate.

Some of the important minerals that form a major part of the mineral resources of Uttarakhand are: Asbestos, Magnestic, Soapstone or Steatite, Copper, Iron, Graphite, Gold, Gypsum, Lead, Slate, Limestone, Building Stone, Sulfur, and Bitumen. Beside these major mineral resources, some of the other mineral resources of Uttarakhand also play a major role in enhancing the economy of Uttarakhand. Some of those mineral resources are: Antimony, Arsenic, Lignite or Brown Marble, Mica, Silver, etc.

GOVERNMENT POLICIES:

NATIONAL MINERAL POLICY, 2008

Keeping in view the long term national goals and perspective for exploitation of minerals, Government of India has revised its earlier National Mineral Policy, 1993 and came up with a new National Mineral Policy 2008. Basic goals of NMP 2008 are-

1.       Regional and detailed exploration using state of the art techniques in time bound manner.

2.       Zero waste mining

For achieving the above goals, important changes envisaged are:

•        Creation of improved regulatory environment to make it more conducive to investment and technology flows

•        Transparency in allocation of concessions

•        Preference for value addition

•        Development of proper inventory of resources and reserves

•        Enforcement of mining plans for adoption of proper mining methods and   optimum utilization of minerals 

•        Data filing requirements will be rigorously monitored

•        Old disused mining sites will be used for plantation or for other useful purposes.

•        Mining infrastructure will be upgraded through PPP initiatives

•        State PSU involved in mining sector will be modernized

•        State Directorate will be strengthened to enable it to regulate   mining in a proper way and to check illegal mining

•        There will be arms length distance between State agencies that mine  and those that regulate

•        Productivity and economics of mining operation, safety and health of workers and others will be encouraged.

Tourism: Project Opportunities in Uttarakhand

PROFILE:

Tourism in India is the largest service industry, with a contribution of 6.23% to the national GDP and 8.78% of the total employment in India. The tourism industry in India is substantial and vibrant, and the country is fast becoming a major global destination. India’s travel and tourism industry is one of them most profitable industries in the country, and also credited with contributing a substantial amount of foreign exchange. Indian Tourism offers a potpourri of different cultures, traditions, festivals, and places of interest.

RESOURCES:

Uttarakhand - the land of gods, the home of Himalayas and truly a paradise on earth, allures everyone from everywhere. Uttarakhand is paradise for different types of adventure activities. Like River Rafting, Trekking, Skiing, Camping, Rock Climbing, Rappelling, River Crossing. Mountaineering, Paragliding and Hot Ballooning make Uttarakhand one of the most attractive destinations for adventure sports not only in the India but the world. Gangotri and Yamunotri, the sources of both the Ganges and Yamuna fall in the upper reaches of the state and together with Badrinath (dedicated to Vishnu) and Kedarnath (dedicated to Shiva) form the Char Dham, one of Hinduism's most spiritual and auspicious pilgrimage circuits. Haridwar, meaning "Gateway to God" is a prime Hindu destination. Haridwar hosts the Kumbha Mela every twelve years, in which millions of pilgrims take part from all parts of the India and the world. Rishikesh near Haridwar is known as the preeminent yoga centre of India. The state has an abundance of temples and shrines, many dedicated to local deities or manifestations of Shiva and Durga, references to many of which can be found in Hindu scriptures and legends.

GOVERNMENT POLICIES:

In order to develop tourism in India in a systematic manner, position it as a major engine of economic growth and to harness its direct and multiplier effects for employment and poverty eradication in an environmentally sustainable manner, the National Tourism Policy was formulated in the year 2002. Broadly, the Policy attempts to:-

•        Position tourism as a major engine of economic growth;

•        Harness the direct and multiplier effects of tourism for employment generation, economic development and providing impetus to rural tourism;

•        Focus on domestic tourism as a major driver of tourism growth.

•        Position India as a global brand to take advantage of the burgeoning global travel trade and the vast untapped potential of India as a destination;

•        Acknowledges the critical role of private sector with government working as a pro-active facilitator and catalyst;

•        Create and develop integrated tourism circuits based on India’s unique civilization, heritage, and culture in partnership with States, private sector and other agencies; and ensure that the tourist to India gets physically invigorated, mentally rejuvenated, culturally enriched, spiritually elevated and feel India from within.

 

Waste management and recycling: Project Opportunities in Uttarakhand

PROFILE:

Rapid industrialization last few decades have led to the depletion of pollution of precious natural resources in India depletes and pollutes resources continuously. Further the rapid industrial developments have, also, led to the generation of huge quantities of hazardous wastes, which have further aggravated the environmental problems in the country by depleting and polluting natural resources. Therefore, rational and sustainable utilization of natural resources and its protection from toxic releases is vital for sustainable socio-economic development.

Hazardous waste management is a new concept for most of the Asian countries including India. The lack of technical and financial resources and the regulatory control for the management of hazardous wastes in the past had led to the unscientific disposal of hazardous wastes in India, which posed serious risks to human, animal and plant life.

RESOURCES:

Investments are aimed at improving public health and the environmental quality in the Program towns and the adjacent open land and water bodies by increasing solid waste collection coverage from 50% to 72% and supporting sound solid waste disposal methods. Improvements will be directed at (i) segregation of solid waste at household level and handling and management improvements at wards and town levels with an emphasis on waste minimization, (ii) provision of solid waste collection and transportation equipment, and (iii) construction of sanitary landfills in accordance with GoI’s Municipal Solid Waste Management and Handling Rules 2000. These will develop into a State wide SWM strategy, action plan, and town wise SWM master plan reports supported by capacity building of ULBs in SWM.

GOVERNMENT POLICIES:

National policy on waste management is set out in the October 1998 policy statement on waste management- Changing our ways. It outlines the Government's policy objectives in relation to waste management, and suggests some key issues and considerations that must be addressed to achieve these objectives. The policy is firmly grounded in an internationally recognised hierarchy of options, namely prevention, minimisation, reuse/recycling, and the environmentally sustainable disposal of waste which cannot be prevented or recovered.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Grain & Potato Based Vodka Distillery
Grain & Potato Based Vodka Distillery

Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation pro... Read More

Capacity :
Vodka from Grain & Potato:30 KLs/Day
Plant and Machinery cost:
3845.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
6316.00 Lakhs
Cost of Project :
6316.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile.Technical textiles are defi... Read More

Capacity :
1296 Lakh Nos. /Annum
Plant and Machinery cost:
103.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
36.00 %
TCI :
980.00 Lakhs
Cost of Project :
980.00Lakhs
Add To Inquiry Basket
Aluminium Conductors (AAAC and ACSR)
Aluminium Conductors (AAAC and ACSR)

A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conduc... Read More

Capacity :
All Aluminium Alloy Conductor: 3000 MT per annum,Aluminium Conductor Steel Reinforced: 3000 MT per a
Plant and Machinery cost:
284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
731.00 Lakhs
Cost of Project :
731.00Lakhs
Add To Inquiry Basket
LPG Cylinders
LPG Cylinders

Liquefied petroleum gas (LPG) is a term describing a group of hydrocarbon-based gases derived from crude oil and or natural gas. Natural gas purifi... Read More

Capacity :
L.P.G. Cylinders (14.2 Kgs Size): 180 Nos./Day, L.P.G. Cylinders (19 Kgs Size): 180 Nos./Day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
56.00 %
TCI :
547.00 Lakhs
Cost of Project :
547.00Lakhs
Add To Inquiry Basket
Rice Cultivation
Rice Cultivation

Rice is the leading food crop in the developing world in terms of total world production. It represents the staple food for almost two-thirds of th... Read More

Capacity :
Rice Paddy: 72500 MT/ Annum•Rice Straw as by product: 145000 MT/ Annum
Plant and Machinery cost:
1741.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
9.00%
Break Even Point (BEP):
10.00 %
TCI :
4418.00 Lakhs
Cost of Project :
4418.00Lakhs
Add To Inquiry Basket
Sodium Silicate from Rice Husk  Hull
Sodium Silicate from Rice Husk Hull

Sodium Silicate from Rice Husk/Hull

Read More

Capacity :
6000 MT/ Annum
Plant and Machinery cost:
144.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
374.00 Lakhs
Cost of Project :
374.00Lakhs
Add To Inquiry Basket
Rice Flakes from Broken Rice (used in Beer Industry)
Rice Flakes from Broken Rice (used in Beer Industry)

Rice flakes are tasty flakes that are created using rice grains. The process for creating rice flakes involves parboiling the rice, then flattening... Read More

Capacity :
20 MT/day
Plant and Machinery cost:
194.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
459.00 Lakhs
Cost of Project :
459.00Lakhs
Add To Inquiry Basket
RUBBER POWDER FROM WASTE TYRES
RUBBER POWDER FROM WASTE TYRES

Rubber is polymer of butadiene and one of the most important chemical ingredients, which is widely used in the different field of modern advance wo... Read More

Capacity :
Rubber Powder : 5.0 MT/day •By Product Steel Wire : 1.4 MT/day
Plant and Machinery cost:
116.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
246.00 Lakhs
Cost of Project :
246.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Technical textiles are defined as textile materials and products used primarily for their technical performance and fu... Read More

Capacity :
96000 Pcs/Day
Plant and Machinery cost:
76.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
45.00 %
TCI :
325.00 Lakhs
Cost of Project :
325.00Lakhs
Add To Inquiry Basket
Pickles (Various Types)
Pickles (Various Types)

Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing busine... Read More

Capacity :
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
48.00 %
TCI :
527.00 Lakhs
Cost of Project :
527.00Lakhs
Add To Inquiry Basket
Sweet & Scented Supari in Pouches
Sweet & Scented Supari in Pouches

The betel nut (Supari) tree, which is known as "ARECA" in South India. It is planted in Bengal, Mysore, Sri Lanka etc. Its yield considered being v... Read More

Capacity :
Plant and Machinery cost:
9.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
192.00 Lakhs
Cost of Project :
192.00Lakhs
Add To Inquiry Basket
Cold Storage
Cold Storage

India is the largest producer of fru... Read More

Capacity :
3000 MT
Plant and Machinery cost:
266.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
882.00 Lakhs
Cost of Project :
882.00Lakhs
Add To Inquiry Basket
Automobile Tyres for Trucks, Buses and Lorries
Automobile Tyres for Trucks, Buses and Lorries

The tyre and tubes are very important rubber products and widely used everywhere in the world. The statistical production figure available from 193... Read More

Capacity :
480000 Nos./Annum
Plant and Machinery cost:
221.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
48.00 %
TCI :
1183.00 Lakhs
Cost of Project :
1183.00Lakhs
Add To Inquiry Basket
Egg Powder
Egg Powder

Egg is one of the most versatile and... Read More

Capacity :
717900 Kgs /Annum,Egg Powder: 690000 Kgs /Annum,Egg Shell Powder (bye Product): 27900 Kgs /Annum
Plant and Machinery cost:
804.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
43.00 %
TCI :
1118.00 Lakhs
Cost of Project :
1118.00Lakhs
Add To Inquiry Basket
Packaging of Tomato Paste
Packaging of Tomato Paste

Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of... Read More

Capacity :
225 Lakh Pouches/Annum
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
308.00 Lakhs
Cost of Project :
308.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Production of Bio Organic Fertilizer from Tea Waste Profitable Project Opportunities in Organic Fertilizers Sector
Production of Bio Organic Fertilizer from Tea Waste Profitable Project Opportunities in Organic Fertilizers Sector

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are t... Read More

Capacity :
150 Nos per day
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
708.00Lakhs
Add To Inquiry Basket
Start Malic Acid (Powder) Production Business
Start Malic Acid (Powder) Production Business

 

Malic acid, also ... Read More

Capacity :
3.3 MT per day
Plant and Machinery cost:
391.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1285.00Lakhs
Add To Inquiry Basket
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business

Disposable blood lancet &am... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)

The chemical family of mela... Read More

Capacity :
8 MT per day
Plant and Machinery cost:
280.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
745.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Cellulosic Cellophane Film
Detailed Project Report on Cellulosic Cellophane Film

CNF (cellulosic cellophane ... Read More

Capacity :
6 MT per day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
681.00Lakhs
Add To Inquiry Basket
Setup E-Waste Recycling Plant
Setup E-Waste Recycling Plant

Electronic wastes are super... Read More

Capacity :
Plastic:1.28 MT/day Ferrous Material:0.80 MT/dayAluminium:0.56 MT/dayGlass:0.80 MT/day Copper:0.56 M
Plant and Machinery cost:
87.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
371.00Lakhs
Add To Inquiry Basket
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
The Abrasive Grinding Wheels Manufacturing Business Plan is the perfect way for you to start a business that Manufactures Abrasive Grinding Wheels
The Abrasive Grinding Wheels Manufacturing Business Plan is the perfect way for you to start a business that Manufactures Abrasive Grinding Wheels

It is a wheel made of bonded abra... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Lovastatin Production business  (from Dextrose, Peptone Powder, Sugar & Soyabean)
Start Lovastatin Production business (from Dextrose, Peptone Powder, Sugar & Soyabean)

Lovastatin is a drug that l... Read More

Capacity :
240 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
2700.00Lakhs
Add To Inquiry Basket
How to Start Surgical Cotton Manufacturing Business
How to Start Surgical Cotton Manufacturing Business

Surgical cotton is also ter... Read More

Capacity :
1000 Kgs. per day
Plant and Machinery cost:
358.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
568.00Lakhs
Add To Inquiry Basket
Start Production Business of Industrial Enzymes used in Textile, Poultry and Paper Pulp Industries
Start Production Business of Industrial Enzymes used in Textile, Poultry and Paper Pulp Industries

Enzymes are great catalysts... Read More

Capacity :
300 MT Per Annum
Plant and Machinery cost:
633.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
959.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Unit
Setup Curcumin Extraction Unit

Turmeric is a gold-colored ... Read More

Capacity :
Curcumin Powder: 100 Kgs/day Turmeric Oil: 48 Kgs/day Deoiled Turmeric: 1,842 Kgs/day
Plant and Machinery cost:
215.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
493.00Lakhs
Add To Inquiry Basket
Tennis Rackets Manufacturing Business
Tennis Rackets Manufacturing Business

A tennis racquet is used to... Read More

Capacity :
400 Pcs Per Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
345.00Lakhs
Add To Inquiry Basket
Monosodium Glutamate Production Business
Monosodium Glutamate Production Business

Monosodium Glutamate (MSG):

Read More

Capacity :
15 MT Per Day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Benzoic Acid or Sodium Benzoate Manufacturing Business
Benzoic Acid or Sodium Benzoate Manufacturing Business

 

Benzoic Acid:

Read More

Capacity :
Benzoic Acid:23.3 MT Per Day | Sodium Benzoate: 6.7 MT Per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
3400.00Lakhs
Add To Inquiry Basket
Sorbic Acid or Potassium Sorbate Production Business
Sorbic Acid or Potassium Sorbate Production Business

 

Potassium and Sor... Read More

Capacity :
Sorbic Acid Powder: 200 MT per annum | Potassium Sorbate Powder: 300 MT per annum
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2000.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Synthetic Tartaric Acid Production Business Best Startup Idea
Detailed Project Report on Synthetic Tartaric Acid Production Business Best Startup Idea

 

Introduction to Synthetic Tartaric Acid:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and  Furnace Heat Recycling inside the Plant) Production Business
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and Furnace Heat Recycling inside the Plant) Production Business

 

Float glass typically has a compressive strength that is substantially higher than its tensile strength. In ... Read More

Capacity :
8000 Sq.Mtrs. per Day
Plant and Machinery cost:
20600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
27.00 %
TCI :
0.00 Lakhs
Cost of Project :
27000.00Lakhs
Add To Inquiry Basket
Aluminium Foil (Pharma Grade) Manufacturing Business
Aluminium Foil (Pharma Grade) Manufacturing Business

A thin metal sheet is aluminium foil. As a result, it can operate as a complete barrier to mould, moisture, gases, scents, ... Read More

Capacity :
12 MT per day
Plant and Machinery cost:
1500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2200.00Lakhs
Add To Inquiry Basket
Set up Sugar Plant
Set up Sugar Plant

 

A sweet, crystalline material made from sugar cane and sugar beet is referred to as sugar. It has countless ... Read More

Capacity :
0
Plant and Machinery cost:
14900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
24300.00Lakhs
Add To Inquiry Basket
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business

Rebar made of glass fibre reinforced polymer is a highly valuable building material. Governments and other large-scale... Read More

Capacity :
1200 MT per Day
Plant and Machinery cost:
58800000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
609700000.00Lakhs
Add To Inquiry Basket
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India Hydrofluorocarbons Market
India Hydrofluorocarbons Market

 

Hydrofluorocarbons, or HFCs, are man-made Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Chilli Oleoresin Manufacturing Business
Chilli Oleoresin Manufacturing Business

Paprika oleoresin is a natural food colorant used to obtain ... Read More

Capacity :
Chilli Oleoresin 7,500 Kg Per Day
Plant and Machinery cost:
2192.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3533.00Lakhs
Add To Inquiry Basket
Set up Mini Steel Plant (Billets and TMT Bar)
Set up Mini Steel Plant (Billets and TMT Bar)

 

A mini steel plant is a smaller version of an inte... Read More

Capacity :
Steel Billets 150 MT Per Day TMT Steel Bars (Rebar) 150 MT Per Day
Plant and Machinery cost:
5445.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
10417.00Lakhs
Add To Inquiry Basket
Start Creamy Peanut Butter Production Business
Start Creamy Peanut Butter Production Business

Creamy peanut butter is a type of peanut butter that has bee... Read More

Capacity :
Creamy Peanut Butter 10,000 Kgs per day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1038.00Lakhs
Add To Inquiry Basket
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)

 

An electric vehicle is a vehicle that uses electricity to power its motors. Ele... Read More

Capacity :
Electric Motorbikes 10.0 Nos. Per Day Electric Scooters 10.0 Nos. Per Day
Plant and Machinery cost:
251.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
1724.00Lakhs
Add To Inquiry Basket
Setting up uPVC and CPVC Pipes Business
Setting up uPVC and CPVC Pipes Business

 

uPVC is an acronym for un-plasticized polyvinyl chloride. It is also known as r... Read More

Capacity :
CPVC Pipes 50 mm 4 MT Per Day uPVC Pipes 150 mm 8 MT Per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
414.00Lakhs
Add To Inquiry Basket
Fertilizers Manufacturing Handbook
Fertilizers Manufacturing Handbook

Starting a fertilizer manuf... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots

Zinc ingots... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing

One of the finest ways to get a professional paint finish is with <... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business

 

How do Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Curcumin Extraction Unit
A Business Plan For Curcumin Extraction Unit

 

Curcumin Extracti... Read More

Capacity :
15,000 Kgs Per Annum , 7,140 Kgs Per Annum , , 2,76,300 Kgs Per Annum
Plant and Machinery cost:
216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
511.00Lakhs
Add To Inquiry Basket
Start Camphor Manufacturing Business
Start Camphor Manufacturing Business

Start Camphor Manufacturing Business. Profitable camphor and camphor Powder & Tablets industry

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Project Opportunities in Production of Calcium Propionate. Fastest Growing & Best Industry for Starting a Business.
Project Opportunities in Production of Calcium Propionate. Fastest Growing & Best Industry for Starting a Business.

Project Opportunities in Production of Calcium Propionate. Fastest Growing & Best... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Choose The Right Business To Start With Investment Of 2 Crores
Choose The Right Business To Start With Investment Of 2 Crores

Choose The Right Business To Start With Investment Of 2 Crores (Plant And Machinery).... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Hospital 30 Bedded
Hospital 30 Bedded

A hospital as a health care organization has been defined in varied terms as an institution involved in preventi... Read More

Capacity :
Special Ward Patients :2 Patients per day General Ward Patients:16 Patients per day Double Bedded Pa
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
468.00Lakhs
Add To Inquiry Basket
Biodegradable Plates & Bowls From Areca Tree Leaf
Biodegradable Plates & Bowls From Areca Tree Leaf

Areca Leaf Plates are made from areca leaf, which are eco friendly and sanitized, Manufacturing in high Quality ... Read More

Capacity :
Bio-Degradable Areca Leaf Round Plates (Size 10"/12") 3,200.0 Pcs./Day Bio-Degradable Areca Leaf Rou
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
79.00Lakhs
Add To Inquiry Basket
Profitable Business Ideas in Manufacturing of Chlorinated Paraffin Wax (CPW) Industry.
Profitable Business Ideas in Manufacturing of Chlorinated Paraffin Wax (CPW) Industry.

Profitable Business Ideas in Manufacturing of Chlorinated Paraffin Wax (CPW) Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Hexa (Methoxymethyl) Melamine (HMMM).
Production of Hexa (Methoxymethyl) Melamine (HMMM).

Production of Hexa (Methoxymethyl) Melamine (HMMM). Profitable Business Ideas in Mela... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Geotextiles (for Road Construction) Manufacturing Plant.
Geotextiles (for Road Construction) Manufacturing Plant.

Geotextiles (for Road Construction) Manufacturing Plant. Production of Geotextiles. Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Starting a Glass Bottles ... 300 MT Per Day 27.00 10600.00
Calcium Chloride Manufact... Calcium Chloride (Flakes): 1667 MT Per Day Carbon Di-oxide (By Product): 463 MT Per Day 26.00 101000.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kg 30.00 198.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kgs 29.00 200.00
Iodine Granules from Iodi... 200 MT Per Annum 31.00 600.00
Activated Carbon from Coc... 6 MT Per Day 29.00 720.00
Sanitary Napkins Manufact... Sanitary Napkins 8pcs in one pkt. (260 mm Size):  21,600 PKTS Per Day 31.00 305.00
Low Toxicity Base Oil fro... 100,000 Ltrs. Per Day 43.00 7200.00
Lab Grown Diamonds (CVD D... Lab Cultured Diamonds (1 Carat): 30 Carat Per Day 24.00 534.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
12345678910...

Showing 661 - 720 of 2752 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.